N High Oaks Spring Texas 77380
About the Project
The work was performed at the ceiling area and garage area of the residence. The project included removing and replacing damaged ceiling drywall with new moisture-resistant drywall, matching the existing texture, and applying primer and 2 coats of paint. The garage work included enclosing the open garage area with new framing, insulation, drywall, exterior siding to match the existing home, interior and exterior paint, installation of a new electrical outlet, weatherproof sealing, and final cleanup with debris removal.































